B 202, 25878 Seeth, Schleswig-Holstein Deutschland
19,50 € zzgl. der Anschlussbeiträge der Versorger und ggf. zzgl. Gebäudepreis
0,6
Development underway. Completed in 2026. Use or sale possible immediately.
340 %
94.030 m²
Bebauungsplan 4
Industrial estate (GE)
The former Stapelholm barracks are located on the outskirts of the municipality of Seeth. The new business park is directly connected to the B 202. Via the B202/B5, you can reach the main A23/B5 north-south axis along the west coast of Schleswig-Holstein or the A7 via Rendsburg in just a few minutes. The A7 as a connection to the highway network to Scandinavia or Hamburg is around 32 km away (Schleswig/Jagel junction). Husum (22 km) can be reached quickly to the north-west and Heide (28 km) to the south-west. The Hanseatic city of Hamburg can be reached within 75 minutes (115 km).
The nearest train station in Friedrichstadt (approx. 6 minutes away by car) offers connections to long-distance trains to Hamburg and the island of Sylt. The nearest commercial ports are in Husum, Büsum and Brunsbüttel. The nearest international airports can be reached in Hamburg and Billund (DK) in less than 2 hours. The surrounding communities and towns are ideal places for employees to live. Universities, scientific institutions and further education facilities can be found along the west coast as well as in Flensburg and Kiel.
The municipality of Seeth has developed a “business and energy park” on the site of the former Stapelholm barracks – in the eastern and southern areas – on an area of just under 10 hectares. See the attached overview/map for the area distribution. The industrial estate is mainly home to halls and shelters. Some of the halls are in very good condition and are ideal for commercial use. Some of the particularly well-preserved halls even have 20-ton overhead cranes. The building occupancy can be found in the general overview. Buildings not listed must be demolished. A building plan is attached. The areas in the business and energy park offer numerous possibilities and are supplied with 100% green electricity. In the future, companies are to be supplied with low-cost electricity via an area network, in some cases also via their own power plants. In order to achieve a high degree of self-sufficiency, an energy partnership between the companies settling here is encouraged. In principle, the designated properties are put up for sale. Subdivisions within the areas or the merging of plots may be possible after a review.
The local authorities are looking for companies that create jobs, bring added value to the region and generate business tax revenue. Settlement projects that are aimed at warehousing and only create a few jobs are expressly not desired. Retail trade is also largely excluded.
Target sectors under the above conditions are: Production / processing / manufacturing, forwarding / logistics services, trade / construction, technical or industry-related services, office-based services (company administration / sales / finance / marketing etc.), data centers / IT infrastructure
INTERESTED? – Then submit a project description online now !
Development underway. Completed in 2026. Use or sale possible immediately.
The purchase price for the plots is EUR 19.50 per square meter. The price includes the development but not the connection fees of the other utilities, such as water, sewage, electricity, gas, telephone, broadband. If a purchase contract is concluded, you must contact the respective utilities in this regard. If there is an existing building on the plot, the price for the building will be added. The price indications are available and can be requested if you are interested. Please do not hesitate to contact us!
For all buildings that are preserved and not demolished, the approval of the building supervisory authority of the district of Nordfriesland will be required for their civil re-use by means of a conversion application, which must be obtained by the buyer. Structural analysis documents must be prepared.
Due to the possible subsequent use, which does not have to provide for heating of the buildings,
energy performance certificates – insofar as these are required – are applied for at a later date.
The intended use must first be clearly established.
The development is in accordance with the B-Plan 4 of the municipality of Seeth: GRZ = 0.6 / BMZ = 10.0 and top up to 28m above sea level/a. Retail trade and wholesale trade with a retail-like sales structure are not permitted (exceptionally max. 10 % up to max. 250 sqm sales area per business). This does not apply to the agricultural machinery trade or trade in agricultural products. In the commercial area, the permitted building height may be exceeded as an exception for technical structures such as chimneys and ventilation systems. Buildings with a maximum length of 120m are permitted provided that the lateral boundary distance is maintained. The provisions of the development plan must be observed for all areas in B-Plan 4.
"Promotion with vision: I stand for a dynamic North Frisia!"
Tilmann Meyer
Authorized signatory, Regional development, Company service, Settlement & Commercial Spaces
Make a request
VR Bank Nord Björn Fischer
Head of Corporate Clients North Friesland for the Niebüll, Bredstedt, Süderlügum, Leck area
VR Bank Westküste Ocke Rickertsen
Head of Corporate Clients North Friesland for the Husum, Viöl and Sankt Peter Ording area
Nord-Ostsee Sparkasse